Our consultation began in November 2018, working with Victims First to design an open plan office, boardroom/training room, breakout workspace cafe, reception area and meeting rooms ready for them to move into in March 2019.

We were delighted to be appointed design and fit out contractor for Victims First’s new office on Cobalt, North Tyneside.

Working alongside the team, we took on board the need for peaceful victims consultation rooms, a  training/meeting room that would be versatile and flexible that allow for different layouts, an open plan office space with huddle areas for private 1-2-1’s and collaboration zones together with Tektura Tekwrite magnetic writeable wall covering.

The reception area was designed to be bright and welcoming and leads to the workspace cafe with breakout seating and a fully fitted integrated kitchen.

Branding and signage were used throughout the office alongside a 10 metre vinyl wall with the Victims First Road to Recovery message standing proud.

Our office furniture team provided and installed the office meeting pods, breakout and collaboration tables, meeting and consultation room and workspace cafe furniture.

Double glazed office partitions were installed with acoustic quilt to ensure the meeting rooms were sound proofed, Duraflor Momenta wood effect flooring was used in the workspace cafe area together with a grey gloss kitchen with integrated appliances and brick tiled splash back..

We loved working with the Victims First and were overjoyed to handover the project to them on time and on budget.

If you would to like hear from Victims First Chief Executive Ruth Parker on what the office fit out meant to them, watch our video on our ‘About Us’ page.